Verified against the city’s published rules · page updated October 21, 2026 · rules change — confirm with the city before applying
A League City plumbing permit starts at $75. Each fixture adds $7. A water line is $15, a sewer line is $35, and a gas permit is a flat $75. Re-inspections run $100, then $300, then $500 for the same failure.
Those figures are on the City of League City’s Building Department Fee Schedule page, headed “Effective August 1, 2026”. City Council adopted them on July 28, 2026 as Resolution No. 2026-143. Before that date the plumbing base fee was $59 and a fixture was $5.00.
Everything below comes from the city’s own pages, forms, ordinance texts and council minutes, and from the Texas Occupations Code, read on 20 October 2026.
The City of League City’s Building Department issues plumbing permits for work inside the city limits.
The department sits inside Development Services with Planning and Engineering. Its permit, registration, inspection and fee pages are all under the Building section of the city site.
building@leaguecitytx.govtylerenergovweb.leaguecitytx.govOne scheduling fact matters before you drive over. The Inspections page says “The Building Department office is only open until noon on Fridays; inspections are only done until 11 a.m. on Fridays.”
League City lies in two counties. The city’s own Relocation page puts it this way: “In order to vote in a League City election, you must be registered to vote in either Galveston or Harris County, depending on your address.” Whichever county your address falls in, a permit inside the city limits comes from this department. The statewide rules are on Texas plumbing permits, and the nearest city guide we have published is Pasadena.
Yes. League City lists “Water heater replacement” by name among the work that requires a permit.
The Building Department’s Permits page has a tab headed “What kind of work requires a permit?” The list includes:
Water heater replacement
Gas reconnections
Electrical reconnections
State law points the same way. Texas Occupations Code §1301.551(c) says a city with a plumbing ordinance must require “a person must obtain a permit before the person performs plumbing, other than the repairing of leaks, the replacement of lavatory or kitchen faucets, the replacement of ballcocks or water control valves, the replacement of garbage disposals, or the replacement of water closets.” A water heater is not on that list. Subsection (a) names the water heater among the things a city regulates.
League City also writes its own water heater rules into its code amendments. Ordinance 2022-06, which adopted the 2021 codes, amends the plumbing code so that “Water heater drain pans shall be metal with drain lines one (1) inch or larger.” Relief valves “shall run to a safe location or outside and turn down a maximum of six (6) inches above ground. They must not discharge into a water heater pan.” On the gas side, the same ordinance says “Gas water heaters in garages or areas where flammable liquids are stored shall be elevated no less than 18 inches above the floor and secured with strapping designed for this purpose. Water heaters shall be on a concrete base. Water heaters set on metal stands are prohibited.” It also requires exterior sediment traps on water heaters.
Those are the city’s own installation rules for the job. The statewide picture is on do you need a permit to replace a water heater in Texas?
The published plumbing permit fee is $75 plus $7 for each fixture, and the city prints no separate water heater line.
From the Building Department Fee Schedule page, headed “Effective August 1, 2026”.
| Line | Fee |
|---|---|
| Plumbing, base fee | $75 |
| Fixtures | $7 each |
| Water line | $15 each |
| Sewer line | $35 each |
| Backflow preventer | $30 each |
| Gas permit, flat rate | $75 |
| Gas reconnect | $75 |
| Irrigation permit, flat rate | $150 |
| Re-inspection, first | $100 |
| Re-inspection, second for the same failure | $300 |
| Re-inspection, third and thereafter for the same failure | $500 |
| Contractor registration and annual renewal | $150 |
The city’s Development Handbook, last updated 9/15/2026, prints the same plumbing and gas lines in a table headed “(Last updated July 28, 2026 via Resolution 2026-143)”.
How these were adopted. The July 2026 Development Times, the city’s own e-newsletter, said proposed fee changes “will be presented to City Council for consideration on July 28, 2026.” The minutes of that meeting record Resolution No. 2026-143 passing with eight votes in favor and none against. Section 4 of the resolution says the Building Department fees “shall become effective on August 1, 2026.” The same night, on second reading, Council passed Ordinance No. 2026-21, which took the fee amounts out of Chapter 22 of the Code of Ordinances and rewrote Section 22-7 to read that an applicant “shall pay the plan review fee, permit fees, and inspection fees in an amount as established by the City’s Building Department Fee Schedule.”
What changed. Exhibit B to the resolution is the old schedule, carrying an effective date of March 1, 2024, marked up with the new amounts. For plumbing it shows the base fee going from $59.00 to $75.00, fixtures from $5.00 to $7.00 each, a water line from $10.00 to $15.00, a sewer line from $25.00 to $35.00 and a backflow preventer from $25.00 to $30.00. The gas base went from $59.00 to $75.00. If a plumber quotes you a $59 permit, the quote is from the old schedule.
For a water heater replacement, we cannot give you a total. The schedule has no water heater line. It does not say whether a water heater counts as a fixture. It does not say whether a gas water heater needs the $75 gas permit on top of the $75 plumbing base. The Building Permit Application has a “STAND ALONE TRADE PERMIT” row with a Plumbing box, and the Building page says the city invoices you after review: “you will receive an email when the permit is ready for payment via your online account.” Ask for the figure before you pay.
Card payments cost more. The fee page says “A convenience fee of 3.8% will be charged on all credit card payments”.
Re-inspections are tiered by repeat failure. The schedule’s three lines are “1st Re-inspection” at $100, “2nd Re-inspection for same failure” at $300, and “3rd Re-inspection (and thereafter) for the same failure” at $500. The Inspections page adds that “Any applicable reinspection fees will need to be paid before requesting additional inspections.” How that compares with other cities is on plumbing re-inspection fees in Texas.
The fee page is one sentence on this: “Any work without a permit is subject to double the cost of the permit fee.” On a $75 base, that is $150 before any fixture, line or gas charge.
Beyond the fee, the plumbing code amendment in Ordinance 2022-06 makes a violation a misdemeanor, with each day “deemed guilty of a separate offense”, punished “within the limits and as provided by state laws.”
How League City compares with other Texas cities is on what a plumbing permit costs in Texas, city by city. What an unpermitted job means after the fact, anywhere in Texas, is on skipping a plumbing permit in Texas.
League City’s own pages and forms do not say whether a homeowner may pull a plumbing permit, so ask the Building Department before you apply.
Start with what the state says. Texas Occupations Code §1301.051: “A property owner is not required to be licensed under this chapter to perform plumbing in the property owner’s homestead.” That exemption is from the license, not from the city’s permit. League City has written that chapter into its own code. Section 22-273, as rewritten by Ordinance 2022-06, adopts Occupations Code chapter 1301 and the plumbing board’s rules, and says the chapter “is hereby adopted as part of the plumbing code for the city.”
Now what the city’s own materials show, and do not show.
So the city’s code incorporates the chapter that holds the homestead exemption, and the city’s forms do not say whether a homestead owner can be the applicant on a plumbing permit. We will not fill that gap from the state rule or from another city’s. Email building@leaguecitytx.gov or call 281-554-1429, say you own and live in the house as your homestead, and ask how an owner applies for a stand-alone plumbing permit in the Online Permit Portal. A rental, a flip, or a house you have not moved into does not fit the state exemption’s wording.
Who may legally do plumbing for someone else is on who can legally do plumbing in Texas.
A contractor registered with the city through the Online Permit Portal, holding a state master license and insurance that names the city. Plumbing contractors are exempt from the $150 registration fee.
The Building page says “Contractors can now register through the Online Permit Portal.” It lists what the registration must include:
Proof of insurance listing the City of League City as the certificate holder (Minimum $250,000 coverage)
Copy of State issued Master or equivalent trade license (when applicable).
Copy of State issued photo ID.
$150 annual registration fee (MEP contractors are exempt; except where doing GC work)
The Contractor Registration Application PDF lists the same four items, with the completed form itself as a fifth, and has a “Plumbing Contractor” box under “State License Required”. It also carries the warning that “The city reserves the right to hold or deny permits to contractors who fail to complete and obtain finals for each permit issued under their registration.”
The fee exemption tracks state law. Texas law bars a city from charging a plumbing contractor a registration fee while still requiring the contractor to register, and League City’s “MEP contractors are exempt” line is the city’s version of that rule. The fee schedule still prints a “Contractor Registration & Annual Renewal” line at $150; the Building page says who pays it. The statute, and what other Texas cities print, is on plumber registration fees in Texas.
Insurance. The city asks for a certificate naming it as holder with “Minimum $250,000 coverage”. Separately, state law in §1301.552 requires the city to verify that the responsible master plumber has a certificate on file with the state board for “not less than $300,000 for all claims arising in a one-year period.” Two documents doing two jobs. Both stand.
Apply through the Online Permit Portal with one consolidated PDF, and pay after the city emails you that the permit is ready.
The Building page sets out the sequence.
For a water heater or other stand-alone job, the Building Permit Application has a row headed “STAND ALONE TRADE PERMIT” with boxes for Mechanical, Electrical and Plumbing. Plumbing that is part of a larger building permit goes in as a sub permit under the main permit number; the city’s “How to Apply for Sub Permits” guide covers that path.
Texas law also lets a contractor apply without the portal. Section 1301.551(e) requires a city that makes plumbing contractors get permits to accept applications, collect fees and issue permits “by telephone, fax, or e-mail”. League City’s pages describe the portal only, with email as the fallback for inspection requests when the portal is down.
Request inspections through the portal by 3 p.m. for the next business day, and expect no inspections after 11 a.m. on a Friday.
The Inspections page opens with “Schedule all inspections via the Online Permit Portal.” If the portal is down, “please email the inspection request with all details to the Building Department.” The same rules are on a one-page notice the department posts, footed May 2023.
The timing rules:
Which work gets inspected is answered in the city’s FAQ: “Any work which is required to be performed by a licensed trade and/or which will be covered from view before it is completed requires inspection.”
The result is left on site and posted to your account. “The inspector should leave correction or approval notice at all inspections; results will also be available under the inspection on your permit portal under the “Checklist” tab.”
A failed inspection costs the re-inspection fee from the tiers above, and the page puts rescheduling on the contractor: “It is the contractor’s responsibility to reschedule any failed inspections.”
The 2021 International Plumbing Code with League City’s amendments, plus Texas Occupations Code chapter 1301 and the plumbing board’s rules, in force since May 1, 2022.
The Building page lists the “2021 International Plumbing Code”, the “2021 International Fuel Gas Code” and the “2021 Texas State Board of Plumbing Examiners Law/Rules” among the codes the city enforces. The adopting ordinance is No. 2022-06. Council passed it on second reading on April 12, 2022, and its Section 21 says it “shall become effective May 1, 2022.”
Section 22-271 adopts the IPC “including all appendices”. Section 22-272 lists the local amendments, including the water heater rules above and a ban on galvanized water pipe: “Galvanized water pipe is not allowed in potable water systems.”
No city page or document we read shows a move past the 2021 editions. Code editions for other Texas cities are on Texas plumbing code by city.
Several things a homeowner would want are not on any city page or document we read.
library.municode.com; that host would not serve it to our reader on 20 October 2026. What is quoted above comes from the city’s own ordinance texts on its agenda system, which cover the plumbing article and the fee section but not every section of Chapter 22.Whoever pulls the permit, the city’s Building Department Fee Schedule is the page to check any figure against.
Every figure on this page comes from one of the documents below, each published by the body that sets, measures or administers the thing it describes. We record the document’s own date and the date we read it, because published pages change without notice.
| Source | Document date | We read it |
|---|---|---|
| City of League City — Building Department Fee Schedule | city web page headed ‘Effective August 1, 2026: The approved Building Department Permit Fee Schedule will be implemented beginning August 1, 2026.’; no other date on the page | 2026-10-20 (read as raw HTML with curl and a desktop Chrome user agent, HTTP 200; every fee line transcribed and every quoted string matched) |
| City of League City — Building Department | undated city web page; carries the notice that the fee schedule ‘will be implemented beginning August 1, 2026’ | 2026-10-20 (raw HTML, HTTP 200; read in full) |
| City of League City — Permits (Building Department) | undated city web page | 2026-10-20 (raw HTML, HTTP 200; the ‘What kind of work requires a permit?’ tab read in full) |
| City of League City — Inspections (Building Department) | undated city web page | 2026-10-20 (raw HTML, HTTP 200; read in full) |
| City of League City — Forms and References (Building Department) | undated city web page | 2026-10-20 (raw HTML, HTTP 200; every linked form and guide name read, the plumbing-relevant ones opened) |
| City of League City — FAQ, Permits, Services & Programs | undated city FAQ category (four questions) | 2026-10-20 (raw HTML, HTTP 200 after redirect to /m/faq?cat=14; all four answers read) |
| City of League City — FAQ, footer: How do I apply for a City permit? | undated city FAQ | 2026-10-20 (raw HTML, HTTP 200; read in full) |
| City of League City — Directory, Building Department | undated directory page | 2026-10-20 (raw HTML, HTTP 200 after redirect to /m/directory/department?did=94; address, phone, fax and email link transcribed) |
| City of League City — City Buildings, Hours, & Holidays | undated city web page with the 2026 holiday schedule | 2026-10-20 (raw HTML, HTTP 200; City Hall and Building Department entries read) |
| City of League City — Relocation | undated city web page | 2026-10-20 (raw HTML, HTTP 200; the Voter Registration paragraph read) |
| City of League City — Building Permit Application (PDF) | 1-page form; PDF created 24 June 2025, modified 30 July 2026; the document title carries ‘Aug2026’ | 2026-10-20 (pdftotext -layout; read in full) |
| City of League City — Contractor Registration Application (PDF) | 1-page form footed ‘KH May 2023’; PDF created 6 February 2024 | 2026-10-20 (pdftotext -layout; read in full) |
| City of League City — Notice: Inspection Requests (PDF) | 1-page notice footed ‘KH 05-2023’; PDF created 2 May 2023 | 2026-10-20 (pdftotext -layout; read in full) |
| City of League City — How to Apply for a Permit (PDF) | 5-page screenshot guide; PDF created 15 August 2023 | 2026-10-20 (pdftotext -layout; text layer read in full) |
| City of League City — Development Handbook (PDF) | 56-page handbook footed ‘Handbook Last Updated 9/15/2026’; its building fee table is headed ‘(Last updated July 28, 2026 via Resolution 2026-143)’ | 2026-10-20 (pdftotext -layout; the Schedule of Fees pages read and every plumbing line matched to the fee schedule page) |
| City of League City — City Council minutes, July 28, 2026 (Legistar) | final minutes of the July 28, 2026 regular meeting; items 6N (Ordinance No. 2026-21, second reading) and 9C (Resolution No. 2026-143) | 2026-10-20 (curl HTTP 200 from the city’s Legistar file host, pdftotext -layout; items 6N and 9C read) |
| City of League City — Resolution amending the Planning and Building Department fee schedules (agenda item 26-0287, Legistar attachment) | 2-page unsigned agenda copy headed ‘RESOLUTION NO. 2026-‘; PDF created 7 July 2026; adopted as Resolution No. 2026-143 per the minutes | 2026-10-20 (pdftotext -layout; read in full) |
| City of League City — Exhibit B, Building Fee Update (agenda item 26-0287, Legistar attachment) | 3-page exhibit; its first two pages are the prior Permit Fee Schedule headed ‘Approved on Council Meeting 01/23/2024’ and ‘Effective March 1, 2024’ marked up with the new amounts; PDF created 28 May 2026, modified 24 June 2026 | 2026-10-20 (pdftotext -layout; the plumbing and gas lines transcribed in both their old and new amounts) |
| City of League City — Ordinance No. 2026-21 (agenda item 26-0288, Legistar attachment) | 3-page unsigned agenda copy; PDF created 6 July 2026, modified 20 July 2026; passed on second reading July 28, 2026 per the minutes | 2026-10-20 (pdftotext -layout; read in full) |
| City of League City — Ordinance No. 2022-06 adopting the 2021 codes (agenda item 22-0147, Legistar attachment) | 16-page agenda copy in redline form, effective May 1, 2022 by its Section 21; PDF created 15 March 2022; passed on second reading April 12, 2022 per the minutes | 2026-10-20 (pdftotext -layout; Sections 1, 3, 12, 13 and the fuel gas amendments read; text quoted only where the redline shows no strikethrough) |
| City of League City — City Council minutes, April 12, 2022 (Legistar) | final minutes; item 9E, Ordinance No. 2022-06 second reading | 2026-10-20 (pdftotext -layout; item 9E read) |
| City of League City — League City Development Times, July 2026 edition | city e-newsletter, July 2026 edition, linked from the city’s Development Times page | 2026-10-20 (raw HTML, HTTP 200; the ‘Development Fee Update’ item read) |
| Texas Occupations Code ch. 1301, §1301.051, §1301.551 and §1301.552 | current online codification; §1301.551 last amended by Acts 2013, 83rd Leg., R.S., Ch. 981 (H.B. 2062), Sec. 7, eff. September 1, 2013 | 2026-10-20 (raw HTML, HTTP 200; the three sections read in full) |
Tell us the job once — we send it to up to 3 license-verified plumbers. Free, no spam, delete your request anytime.
Secure form. Sent over an encrypted connection to up to 3 license-verified plumbers. Never sold to data brokers, and you can have your request deleted anytime.